Creekside Village, Anne Arundel County, MD

  • Geotechnical engineering, environmental consulting, COT services for the 161-acre community with 820 single-family homes and townhome lots, 208 apartment units within six buildings, two clubhouses, & two swimming pools.
  • Named “Community of the Year,” by MBIA Land Development Council.
  • Received the “Excellence in Construction Award, New Project Over $10 Million,” from Baltimore Metro Chapter of the Associated Builders and Contractors, Inc.

Point Street Apartments, Baltimore City, MD

  • Geotechnical engineering, environmental consulting, and COT services for the 270,000-SF, 17-story apartment building with a one-level, 40,000-SF below grade parking garage, and 18,000 SF of retail space on the first floor.
  • The foundations for the project include over 300 driven, environmental concentric closed-end steel pipe piles filled with concrete.

Lancaster Newspaper Parking Structure, Lancaster, PA

  • Provided geotechnical services for the construction of a six-level precast concrete parking structure.
  • Designed a permanent shoring system that would also function as a permanent pressure relief wall which included a soldier pile wall with shotcrete lagging and a soil nail wall with shotcrete facing.
  • Designed the micropile system to support the proposed garage footings on the underlying limestone bedrock.

Four Seasons Hotel & Legg Mason Office Complex, Baltimore City, MD

  • 22-Story luxury hotel and condominium tower and a 26-story office tower at Baltimore‚Äôs waterfront with 5-story below grade parking.
  • Construction observation and testing included a slurry wall, mat foundation, post-tensioned concrete, micro-piles, caissons, and tie-back anchors.
  • Geotechnical, environmental, and hydrogeological services including borings, monitoring wells, seismic analysis, and in-situ permeability testing.