Dover Behavioral Health Center Additions, Kent County, DE

  • Subsurface exploration, laboratory testing, geotechnical engineering, and COT services for Phase I and II expansions to the behavioral center.
  • Foundation recommendations, infiltration testing for use in design of SWM facility and Best Management Practice, and pavement evaluation and recommendations.
  • Provided special inspections in accordance with IBC during construction of the expansion project.

Big Chill Beach Club, Sussex County, DE

  • Public/private joint venture between DNREC and La Vida Hospitality Group.
  • 200-seat oceanfront restaurant and event facility located at Delaware Seashore State Park.
  • Geotechnical engineering; electronic Cone Penetration Test (CPT) soundings extending upwards to 100 feet deep; COT services including Class B timber and 12×12-inch concrete pile installation, vibration monitoring during pile installation, and site visits and reports for bank draws.

The Residences at Mid-Town Park, City of Wilmington, DE

  • Subsurface exploration, laboratory testing, geotechnical engineering, and COT services.
  • Shear wave tests and post construction dewatering recommendations for foundation and pavement design.
  • 417,000-SF, 3 levels of underground parking for 511-cars, requiring excavations of about 32 to 44 feet.
  • 5-story and a 7-story buildings connected by pedestrian bridge, retail, 198 apartment units, elevated courtyard, and resort-style swimming pool.

Mariner Bay at Annapolis Towne Centre, Building 2, Anne Arundel County, MD

  • Subsurface explorations including SPT borings, seismic Cone Penetration Test soundings, and test pits.
  • 12-story mixed-use facility including 208 luxury apartments, 95,000 SF of retail, and 1,000-car parking structure.
  • The seismic CPT soundings allowed GTA to improve the seismic site class for the site resulting in a cost-effective structural design.
  • Construction phase observation and testing services.