- 79,795-SF ARC training facility, 5,703-SF organization maintenance shop, and 5,163-SF storage building, and infrastructure, several parking lots, associated infrastructure, and SWM.
- GTA provided geotechnical consulting services including seismic site classification.
- GTA also provided construction observation and testing services during construction.