- Retrofit two power generation station units with air quality control systems to meet future air pollution requirements.
- Services included construction observation and testing for micro-piles; auger pressure grouted piles and displacement piles; pile caps, concrete slabs, and structure fills.
- Forensic evaluations were performed on partially poured pile caps for a byproduct silo.