- Subsurface exploration, laboratory testing, geotechnical engineering, and COT services.
- Shear wave tests and post construction dewatering recommendations for foundation and pavement design.
- 417,000-SF, 3 levels of underground parking for 511-cars, requiring excavations of about 32 to 44 feet.
- 5-story and a 7-story buildings connected by pedestrian bridge, retail, 198 apartment units, elevated courtyard, and resort-style swimming pool.